Loading Procedure - GE TONOPORT V Service Manual

Ambulatory blood pressure system
Hide thumbs Also See for TONOPORT V:
Table of Contents

Advertisement

6.2

Loading Procedure

6-2
Firmware Loading Procedure: Loading Procedure
Connect inactive TONOPORT V to USB port or RS232 port via the USB or
RS232 cable.
Turn on TONOPORT V.
NOTE
After TONOPORT V has been switched on, updating can only be carried
out within the first 10 minutes. After 10 minutes TONOPORT V enters a
power down mode and can be reactivated by switching on and off.
Click the "Start Update" button and follow the displayed prompts.
Switch off TONOPORT V.
Disconnect TONOPORT V from PC.
TONOPORT V
2001589-094
Revision D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents