Ibm 5106 Auxiliary Tape Unit Setup Procedure - IBM 5100 Basic Reference Manual

Hide thumbs Also See for 5100:
Table of Contents

Advertisement

(
(-
(
(
(
(
IBM 5106 -Auxiliary Tape Unit Setup Procedure
o
1.
Set the 5100 and auxiliary tape unit power switches to OFF.
02.
Remove the shipping tape from the signal cable (flat cable) and connect the
signal cable into the back of the 5100. Make sure the connector fits squarely.
Turn the knob in a clockwise direction until the connectors fit together firmly.
Storage Position for Terminator Plug
\\\\\I\\IIIIIIIIIIIIIIIIIIIIIII!I
~
Terminator
Plug
The terminator plug connects
into the lower position
. Power Line Plugs
o
3.
Check that the terminator plug is in place on the rear panel as shown in the
preceding diagram.
o
4.
Remove the shipping tape from the power line and plug the power line into
a grounded electrical outlet.
05.
Set the auxiliary tape unit POWER switch to ON, and be sure that the fan is
operating.
a. If your I.ocation is not too noisy, you should hear the fan motor operating.
b. If you are not sure, hold a light piece of paper near the air intake on the
left side of the tape unit. The loose end of the paper should be pulled
toward the tape unit.
If the fan does not appear to
be
operating, check your power outlet. If it is
OK, set the POWER switch to OFF and call for service. Do not continue with
these instructions.
o
6.
Set the 5100 POWER switch to ON and continue to the checkout procedure.
163

Advertisement

Table of Contents
loading

Table of Contents