Download Print this page

Rear Floor Frame - Arrow GS83C Owner's Manual & Assembly Instructions

Advertisement

Step 5
BE17
Select one of the suggested nishing materials. Be sure Floor Frame Kit lies at on the ground. To prepare
the earth bed, remove sod and other organic debris, level the high spots with a at shovel, and tamp the bed
down.
LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL (5/8" 15,5 mm MINIMUM THICKNESS)
NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building.
The properties of Pressure Treated Lumber will cause accelerated corrosion. If Pressure Treated
Lumber comes in contact with your storage building your warranty will be voided.
IMPORTANT NOTE: If leveling blocks are required due to uneven ground conditions, the oor frame kit must
be completely supported, because the kit is not self supporting. Plywood rests on top of the oor frame.
Step 6 Placement & Amount of Material
Drill and fasten wood
to steel frames using
dry wall screws
NOTE: ALIGN EDGE
OF PLYWOOD WITH
SIDE AND REAR
FLOOR FRAMES.
SUGGESTION: Use remaining decking
material for shelving or entry ramp.
Finishing Material
CORRECT
32 5/8"
INCORRECT
82,9 cm
94"
238,8 cm
FRONT
1-4x8 1220x2440 mm SHEET
DECK MATERIAL
FRAME MUST BE SQUARE AND LEVEL
BEFORE ATTACHING PLYWOOD.
17

Advertisement

loading

This manual is also suitable for:

Gs83eucGs83soscGs83lm