Page 1
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual Series ATP Electric Chemical Injection Pump Operating Manual CheckPoint Headquarters CheckPoint UK CP Pumps & Systems FZE 21356 Marion Lane C2 Lombard Centre Shed 2, Warehouses 7 & 8...
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual TABLE OF CONTENTS 1. SYSTEM REQUIREMENTS Inspection ..............................3 Storage................................. 3 Unpacking..............................3 Safety ................................3 Location ............................... 3 Typical Installation Schematic ........................4 Connect chemical and process lines to checks ..................4 2.
1.3 Unpacking The ATP pump can be shipped as a single-head or dual-head pump. Please ensure that unpackaged pumps are securely placed in a safe area. Refer to the CheckPoint Quick Setup Guide for installation of the ATP pump. 1.4 Safety The Series ATP can produce high rod loads.
6. Discharge Line Block Valve 9. Discharge Pressure Gauge All items in Figure 1 can be purchased from CheckPoint. Call today for our latest prices on pumps, gauges, packages and other components. *CheckPoint OEM products 1.7 Connect chemical and process lines to checks Always clean suction lines and check chemical containers to ensure that they are free of all foreign matter, sand, sludge, or chemical buildup.
A presuction in-line chemical filter is strongly recommended to prevent early packing failure. Abrasive particles carried into the pump through suction plumbing is a common cause of packing failure. CheckPoint offers a range of chemical filters suitable for use with the Series ATP pump. 1.7.1 Suction Check The attach point is a ¼”...
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual 3. INJECTION HEAD ASSEMBLY The base-level Series ATP pump assembly comes with a single head attached to the drive assembly (shown in Figure 2). FIGURE 2: INJECTION HEAD ASSEMBLY *Motor and Base Removed for Clarity CP-MAN-PRD-ATP REV00...
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual 3.1 Adding an Injection Head. The base model Series ATP comes with a single head but can be easily converted to a double-headed configuration. You will need the following assemblies: Figure 3: Head Assembly - Typical Figure 4: Retainer Assembly –...
Page 8
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual 3.1.2 Install plunger, snap ring, and screw assembly. Loosen the clamp screw approximately ½-turn. • Screw the adjusting nut into the retainer assembly. • NOTE: The adjusting nut screwed in until it bottoms out on the end plate is full-stroke.
Series ATP Reciprocating Drive - Dual or Single Head With Adjustable Stroke Length Operating Manual 3.1.3 Attach head assembly Remove the two head bolts and install the thru drive housing wall. • Add the approved grease on the tip of the plunger. •...
FIGURE 9: SHOWN AT 50% STROKE End Plate 5. OPERATION The CheckPoint Series ATP drive requires no additional lubrication. The cam bearing is sealed, and the guide rods have sufficient grease in the carriage assembly prior to shipment. Pump Flow Rate – DC Motor The flow rate can be adjusted by changing the motor rpm and by changing the stroke length.
6.1.2 Ensure that the required amount of power is supplied to the motor and that the motor is turned on. 6.1.3 Check to see if the motor power is too low. 6.1.4 Ensure proper motor sizing for the particular application. Contact CheckPoint or your Authorized CheckPoint Distributor for sizing assistance.
6.3.1 CheckPoint offers exchange programs to keep you in service. 6.3.2 CheckPoint will ship you a rebuilt pump, which you will be able to install prior to sending us your existing pump. Upon receipt of your pump, we will tear it down, rebuild it, and report to you our findings. We offer a fixed- price exchange plan, an actual-cost plan, and a consigned exchange plan.
Need help?
Do you have a question about the ATP Series and is the answer not in the manual?
Questions and answers