Beacon Athletics Streamliner 353 Assembly & Usage Manual page 9

Table of Contents

Advertisement

USING THE VARIABLE FLOW CONTROL
The Streamliner's Variable Flow On/Off Control gives
you total command of the flow of your dryline material.
Some dryline material will flow rapidly while others flow
more slowly and can "bridge" within the hopper.
With this in mind, the Variable Flow Control was designed
for the operator to adjust the opening according
to each material's flow rate.
The off position is in the center. Move the
spring-loaded lever upwards to mark a 2" line
and downwards for a 4" line. The further
away from the off position you get,
the wider the opening gets for chalking
material to flow through.
Three preset notches on both the 2"
and 4" end of the control allows the
operator to lock in the chalk flow
and adjust on the fly, as necessary.
@beaconathletics
|
/beaconathletics1948
2" control notches
4" control notches
|
BeaconAthletics.com
99
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streamliner 70

Table of Contents