THUNDER TIGER Mini Titan E325 SE Manual page 25

3d performance
Hide thumbs Also See for Mini Titan E325 SE:
Table of Contents

Advertisement

Tail Boom Bracket Set- 2
Ba g J
No.
1
2
St e p 1
1.Pull the belt through the Tail Boom Bracket and keep the belt correctly aligned.
2.Push the Tail Boom into the Tail Boom Bracket and the Tail Drive Belt must be rotated as
shown below.
St e p 2
1.Place the belt over the Pulley
and gently pull back the Tail
Boom until the tension of the
belt allows no more than
5mm of free play.
2.Fix the Tail Boom in the
bracket with the Socket
Screws and M2 nuts. Do not
forget to apply Loctite on the
screws.
-24-
Description
Socket Screw, M2x12
Nut, M2
N ot e :
Q'ty
2
2
C.C.W
(1)
(2)
T22
C.C.W

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents