On switching on the unit the STATUS indicator on the front of the unit should turn GREEN if all
is OK.
Please note that if a high stability crystal reference is included then the warm up time will be
increased to 5 minutes as the high stability crystal takes much longer to phase lock to the
PDRO reference oscillator.
If an alarm condition continues to show check alarm conditions on the rear panel
Connect the INPUT signal in to the connector/s marked INPUT taking note of the power of the
signal being input.
Output from the unit is from the connector/s marked OUTPUT.

Menu Structure

On Power up the unit will start in HOME mode displaying the following options.
Generally YES will select/enable an item and NO will step back one step with no changes.
The unit's HOME screen has 5 main menu options as shown in Figure 1 below:
Operating display
This menu shows a graphical representation of the RF path and attenuation values.
When the attenuation option is fitted:
Pressing the up and down keys will immediately change the attenuation by 0.1dB.
Pressing the left and right keys will immediately change the attenuation by 0.5dB.
Status
This menu shows an immediate summary of all settings and alarm conditions, more details
may be available by pressing the down arrow.
Issue 1.34
IBDH/IBUH/TLTH/ILAH Installation and Operation Handbook
Figure 1
Figure 2
Page 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibuh seriesIlah seriesTlth series

Table of Contents