6.14. Remove the SC-Board
1. Disconnect the couplers (SC2, SC20 and SC23).
2. Remove the screws (×6
6.15. Remove the SS-Board
1. Disconnect the couplers (SS11, SS12, SS23 and SS34).
2. Disconnect the flexible cables (SS41, SS42, SS43 and
SS44).
3. Remove the screws (×6
) and remove the SC-Board.
) and remove the SS-Board.
6.16. Remove the C1-Board
1. Remove the flexible cables holder fastening screws (×6
).
2. Disconnect the flexible cables (CB1, CB2 and CB3).
3. Disconnect the flexible cable (C11).
4. Disconnect the coupler (C12).
5. Remove the screws (×3
6.17. Remove the C2-Board
1. Remove the flexible cables holder fastening screws (×8
).
2. Disconnect the flexible cables (CB4, CB5, CB6 and CB7).
3. Disconnect the flexible cable (C21).
4. Disconnect the couplers (C22 and C23).
5. Remove the screws (×3
left and remove the C2-Board.
13
TH-42PM50U
) and remove the C1-Board.
) and slide the C2-Board to the