Pre-Power Testing for the PTP 600 Series with T1/e1
Pre-Power Testing for Motorola PTP 600 Series T1/e1 connections
Before plugging in the rJ45 to the Pidu Plus, check the following impedances at
the rJ45:
1.
check the cable resistance between pins and 6 and pins and 8 at the rJ45
against column in the table.
2.
check the cable resistance between pins 1 and and pins 4 and 5 at the rJ45
against column in the table.
caT-5
Resistance
length
between pins 3&6,
meters
and pins 7&8
0
0.8
10
2.5
20
4.2
30
5.9
40
7.6
50
9.3
60
11.0
70
12.7
80
14.4
90
16.1
100
17.8
Resistance
between pins 1&2,
and pins 4&5
1.3
3.0
4.7
6.4
8.2
9.8
11.5
13.2
14.9
16.6
18.3
1
Tech NoTe: LighTNiNg ProTecTioN guide
Resistance Table
referenced to the RJ45
at the PiDU Plus