Download Print this page

Daikin FVXS35FV1B Service Manual page 5

2.5/3.5/4.5/5.0 kw class, 9000/12000/15000/18000 btu/h class removal procedure
Hide thumbs Also See for FVXS35FV1B:

Advertisement

Si061262EE
Step
4
Release the 4
projections and remove
the Titanium apatite
deodorizing filter ASSY
from the air filter.
5
Release the 4 hooks
and remove the
Titanium apatite
deodorizing filter from
the frame.
6
Remove the other
Titanium apatite
deodorizing filter ASSY
in the same way.
7
Release the string from
the hook.
8
Release the 3 hooks of
the bottom of the front
panel and remove the
front panel.
Removal Procedure
Procedure
Air filter
Projection
Titanium apatite deodorizing
filter ASSY
Titanium apatite deodorizing filter
Hook
Frame
Hook
Front panel
Air Filters / Front Panel / Front Grille
Projection
(R24290)
Hook
(R24291)
Front grille
Hook
(R24292)
When installing the front
panel, catch the 3 hooks of
the front grille and hitch the
string to prevent the front
panel from dropping.
(R22749)
Points
3

Hide quick links:

Advertisement

loading