Comple Ng The Installa On - QRS Music Technologies QRS PNO3 Installation Manual

Table of Contents

Advertisement

Install the two key solenoid rail covers using "L" brackets 
Cut notches in the cover for the sustain lever 
and cables. 
A ach the eight "L" brackets to the two rail cover 
sec ons using bolts and nuts. A ach the two sec ons 
to the keybed. The cover sec ons overlap. 
Refer to the QRS PNO3 User Guide for details on Adjustments and Opera on. 
Comple ng the Installa on 
Shutdown the system and unplug the unit from AC power. 
Install the Rail Covers 
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents