Install the two key solenoid rail covers using "L" brackets
Cut notches in the cover for the sustain lever
and cables.
A ach the eight "L" brackets to the two rail cover
sec ons using bolts and nuts. A ach the two sec ons
to the keybed. The cover sec ons overlap.
Refer to the QRS PNO3 User Guide for details on Adjustments and Opera on.
Comple ng the Installa on
Shutdown the system and unplug the unit from AC power.
Install the Rail Covers
51