Siemens SIRIUS 3RW30 Manual page 5

Industrial controls
Hide thumbs Also See for SIRIUS 3RW30:
Table of Contents

Advertisement

9
Installation / mounting ........................................................................................................................... 71
9.1
General information ................................................................................................................ 71
9.2
General feeder assembly (type of coordination 1) .................................................................. 72
9.3
Soft starter with line contactor (type of coordination 1) .......................................................... 73
9.4
Soft starter assembly with type of coordination 2 ................................................................... 74
9.5
Capacitors to improve the power factor .................................................................................. 76
9.6
Maximum cable length ............................................................................................................ 76
10
Connecting ........................................................................................................................................... 77
10.1
Electrical connection ............................................................................................................... 77
10.1.1
Control and auxiliary terminals ............................................................................................... 77
10.1.2
Main circuit connection ........................................................................................................... 77
11
Operation .............................................................................................................................................. 81
11.1
Operator controls, displays, and connections on the 3RW30................................................. 81
11.2
Operator controls, displays, and connections on the 3RW40................................................. 82
11.3
Effects on changing the potentiometer settings ...................................................................... 84
12
Configuration ........................................................................................................................................ 85
12.1
Configuration in general .......................................................................................................... 85
12.1.1
Configuration procedure ......................................................................................................... 86
12.1.2
Selecting the optimum soft starter .......................................................................................... 86
12.2
Startup class ........................................................................................................................... 89
12.2.1
12.2.2
12.3
ON time and switching frequency ........................................................................................... 92
12.4
Reducing the rated data ......................................................................................................... 93
12.5
12.6
Installation altitude and ambient temperature ......................................................................... 94
12.7
Calculating the permissible switching frequency .................................................................... 95
12.7.1
12.7.2
Calculating the switching frequency (example) ...................................................................... 98
12.8
Configuration aids ................................................................................................................. 100
12.8.1
12.9
Article number system for the 3RW30 .................................................................................. 101
12.10
Article number system for the 3RW40 .................................................................................. 102
13
Commissioning ................................................................................................................................... 103
13.1
Commissioning the 3RW30 .................................................................................................. 103
13.1.1
Commissioning procedure .................................................................................................... 103
13.1.2
13.1.3
Setting the soft start function ................................................................................................ 105
13.1.4
Setting the starting voltage ................................................................................................... 106
13.1.5
Setting the ramp time ............................................................................................................ 106
SIRIUS 3RW30 / 3RW40
Manual, 10/2018, NEB535199502000/RS-AB/005
Table of contents
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sirius 3rw40

Table of Contents