2.0 INSTALLATION INSTRUCTIONS

2.1

Unpacking and Installation

NOTE
Read the entire manual before installing and operating the system. Upon receipt of a Liebert EXM
tribution Cabinet
Dis
installation.
2.1.1

Unpacking and Preliminary Inspection

A quality installation begins on the receiving dock.
1.
Inspect the shipment for damage or signs of mishandling before unpacking the unit(s).
2. If the Liebert EXM
carefully.
Use care to avoid puncturing the container with sharp objects that would damage the contents.
3.
Remove the packing and vapor barriers and inspect the equipment for any obvious shipping damages.
NOTE
The units should not be loosened from the shipping pallet until all handling by forklift or pallet
jack is completed. Complete internal inspection should be accomplished only after equipment
positioning and prior to electrical hookup.
4. If any damage is observed, immediately file a damage claim with the shipping agency and forward a copy
to:
Vertiv Corporation
1050 Dearborn Drive
P.O. Box 29186
Columbus, Ohio 43229 USA

2.1.2 Handling Considerations

The Liebert EXM
Distribution Cabinet
equipment.
The Liebert EXM
Distribution Cabinet
place after it has been unbolted from the pallet. The unit should be kept on the shipping pallet
until it has been moved by forklift as close as practical to its installation location.
Refer to the cabinet drawings furnished with the Liebert EXM
size and weight. Typical cabinet dimensions and weights are shown in Figures 1 and 2.
The route to the Liebert EXM
that all passages, including doorways, elevators, ramps and hallways, are large enough to
accommodate the unit and that the floors are strong enough to support the weight. Determine
whether any corners or offsets would cause problems in maneuvering the unit.
Vertiv recommends removing the exterior side panels, if supplied, before the unit is moved. This
will prevent scratches, dents and other damage to the panels.
Vertiv
| Liebert
Distribution Cabinet
®
, the installer should perform the following steps to ensure a quality
Distribution Cabinet
was shipped in an export crate, open the shipping crate
is bolted to a wooden pallet to allow handling by forklift
is furnished with casters to allow the unit to be rolled into
Distribution Cabinet
for Liebert EXM
Distribution Cabinet
's installation area should be planned to ensure
User Manual |
for the unit's
3

Advertisement

Table of Contents
loading

Related Products for Liebert EXM Distribution Cabinet

Table of Contents