Chapter 5 Verify Operation; Simulation Mode; Starting Simulation Mode - IDEC HG4F Basic Tutorial

Oi touchscreen
Table of Contents

Advertisement

Chapter 5
Verify Operation

1 Simulation Mode

Running Simulation Mode will verify whether the downloaded project data is displayed cor-
rectly and if it will function properly on the Operator Interface.

Starting Simulation Mode

The IDEC OI Touchscreens have a simulation mode that enables the Operator Interface to
check the functionality of the project without being connected to a PLC.
1.
Simultaneously press the top right
and top left corners on the screen
for 3 seconds.
The Maintenance screen appears.
2.
Press the [System Mode] button.
The Main Menu screen appears.
3.
Press the [Debug] button.
The Debug screen appears.
4.
Press the [Simulat n] button.
5.
Press the [Start] button.
The project [Operating Screen] is dis-
played, and simulation is enabled.
(
Simulation Mode
tom left of the screen.)
36
will blink at the bot-
www.IDEC.com/software
Host Communication err
Fri 4/04/2008 12:00:01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hg2fHg3fHg2s

Table of Contents