Recommended Spare Parts - QC Conveyors Automation Series Installation & Maintenance Instructions Manual

Hide thumbs Also See for Automation Series:
Table of Contents

Advertisement

u Tail Pulley Replacement
1
Press both tension release
buttons and lift up simultane-
ously.
5
Making sure to keep dog
point of set screw facing
down, insert idler pulley back into
slot.
>
Re-tensioning and tracking of belt may be necessary. (Refer to tracking and tensioning sections of this manual.)

Recommended Spare Parts

u Parts List
Part #
1A0039B00WW
AE4-WW-LLL-MAE
1A0102C
1A0103C
1A0033A00WW
1A0036A
1A0037A
C-0117-090
1A0099C00WW
1A0100C00WW
>
Use the two digit width of the conveyor for "WW".
Use the width and 3-digit length of the conveyor for "LLL".
>
To order parts, please visit QCconveyors.com/serial or call us at +1 (513) 753-6000.
22
AS40 Conveyors | Installation & Maintenance Instructions
2
Lift idler pulley out of slot.
6
Press Tension Release tail
pulley down until it "Locks"
into the locked position.
Description
Tail Assembly
White Urethane Belt (MVE for V-Guided)
Drive End Bearing Housing LH
Drive End Bearing Housing RH
Underside Idler Roller Full Width
Underside Idler 2"- 6" Wide Stub Roller
Underside Idler 8" - 24" Wide Stub Roller
Drive Timing Belt (090 for ≤ 50 Sprocket teeth, 100 for ≥ 52 sprocket teeth)
Single Output Drive Pulley and Bearing Assembly
Dual Output Drive Pulley and Bearing Assembly
3
Remove Idler pulley from
conveyor.
4
Replace with new idler pulley.

Advertisement

Table of Contents
loading

This manual is also suitable for:

As40

Table of Contents