Connect Internal Power And Grounding Cables; Important Safety Instructions - Cisco BTS 10200 User Manual

Softswitch
Hide thumbs Also See for BTS 10200:
Table of Contents

Advertisement

Connect Internal Power and Grounding Cables

Figure 6
Connect Internal Power and Grounding Cables
After obtaining approval from a supervisor, an authorized power installer should follow these steps to
connect DC power cables and ground cables from the power distribution unit (PDU) to the other devices
in the Cisco BTS 10200 Softswitch rack.
Note

IMPORTANT SAFETY INSTRUCTIONS

Warning
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you
work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar
with standard practices for preventing accidents. To see translations of the warnings that appear in
this publication, refer to the translated safety warnings that accompanied this device.
Note: SAVE THESE INSTRUCTIONS
Note: This documentation is to be used in conjunction with the specific product installation guide
that shipped with the product. Please refer to the Installation Guide, Configuration Guide, or other
enclosed additional documentation for further details.
Step 1
Connect the intershelf DC power cables from the PDU to each of the devices in the rack. See
page 23
8
C I S C O C O N F I D E N T I A L
Location of SPE0 and SPE1 Connectors on CA Backplane
Call agent (AXmp)
If you need to connect an AC system, contact your Cisco account team for assistance.
for the complete cabling list.
Location of SPE0
and SPE1 connectors
(Used for SS7 signaling)
Table 1 on
OL-2906-01

Advertisement

Table of Contents
loading

Table of Contents