Lee Technology LTK-1100 Operating Instructions Manual page 2

Guest paging system
Table of Contents

Advertisement

Thank you for purchasing the GuestCall Paging System. The most advanced coaster paging
system on the market!
EQUIPMENT SET_UP
LTK-1100/ AC Adapter/Internal Antenna/manual
Keypad Sending Unit:
Unwrap all sending unit components. Lock the antenna into the hole in the upper right hand corner of
the sending unit. Plug the power supply with the large tip into a standard 110 outlet and plug it into the
back of the sending unit. We recommend some type of surge suppressor on the power supply for
protection. Power surges are not covered under system warranty!
Coaster Setup:
Locate the black charging base in a sturdy, out of the way location. Connect the charger bases
together using the included jumper wires. Use the power supply with the small tip and plug it into a
standard 110 outlet and into either open plug on the charger base. Be sure to plug the jumpers &
power supply jacks in all the way.
Stack the coasters on the black
charging base. The coaster number
will always face front and the red
charge indicator light will be on the left.
We recommend that you do not
stack coasters more than 15 high.
You should see a red light appear on each coaster. This light indicates proper charging is taking place.
NOTE: A wall mountable coaster holder is available for this system.
Coaster Numbers:
On the front of each coaster is your coaster number.
Transmitter
Power
Supply
LeetekTransmitter
GuestCall Coaster Paging System Instructions(LTK-1100)
C h arg e L ig h t
Surge Protection Recommended!!!
Coaster Power Supply
(Use 1 power supply per 60
1
2
3
4
J u m p e r W ir e
Jumper wire
coasters)
5
6
P o w e r S u p p ly
12v AC
1.5 amp
You should
stack a
maximum of
15 coasters
per charger.

Advertisement

Table of Contents
loading

Table of Contents