LG LV-B1864CL Product Data page 80

Ceiling & floor 50hz, r22, ceiling suspended 50hz, r22
Hide thumbs Also See for LV-B1864CL:
Table of Contents

Advertisement

15. Installation
6) Checking the Drainage
1. Set the air direction louvers up-and-down to the posi-
tion(horizontally) by hand.
To check the drainage.
1. Pour a glass of water on the evaporator using a ket-
tle.
2. Ensure the water flows through the drain hose of the
indoor unit without any leakage and goes out the
drain exit.
Drain piping
1. The drain hose should point downward for easy drain
flow.
2. Do not make drain piping like the following.
Do not raise
Water
leakage
Accumulated
drain water
Air
Water
Waving
leakage
Ceiling & Floor, Ceiling Suspended (50Hz, R22)
Tip of drain hose
dipped in water
Water
leakage
Ditch
Downward slope
Less than
50mm gap
79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents