Specification Of Rework; Process Of Rework; Preparations Of Rework; Removing Of The Module - Huawei ME909 Series Hardware Manual

Lte lga module
Hide thumbs Also See for ME909 Series:
Table of Contents

Advertisement

HUAWEI ME909 Series LTE LGA Module
Hardware Guide

6.9 Specification of Rework

6.9.1 Process of Rework

6.9.2 Preparations of Rework

6.9.3 Removing of the Module

The solder is molten and reflowed through heating during the module removing
process. The heating rate must be quick but controllable in order to melt all the solder
joints simultaneously. Pay attention to protect the module, PCB, neighboring devices,
and their solder joints against heating or mechanical damages.
Issue V0.3 (2013-05-21)
Remove barrier or devices that can't stand high temperature before rework.
If the device to be reworked is beyond the storage period, bake the device
according to Table 6-1 .
The LGA module has many solder pads and the pads are large. Therefore, common
soldering irons and heat guns cannot be used in the rework. Rework must be done using
either infrared heating rework stations or hot air rework stations. Infrared heating rework
stations are preferred, because they can heat components without touching them. In
addition, infrared heating rework stations produce less solder debris and less impact on
modules, while hot air rework stations may cause shift of other components not to be
reworked.
It is proposed that a special clamp is used to remove the module.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Mechanical Specifications
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Me909u-521Me909u-121Me909u-721

Table of Contents