Huawei ME909 Series Hardware Manual page 27

Lte lga module
Hide thumbs Also See for ME909 Series:
Table of Contents

Advertisement

HUAWEI ME909 Series LTE LGA Module
Hardware Guide
Power-On Time Sequence
After VBAT has been applied and is stable, the POWER_ON_OFF signal is pulled
down, and then the module will boot up.
During power on timing, please make sure the VBAT is stable.
Figure 3-6 Power on timing sequence
Table 3-5 Power on timing
Parameter
T
PON
T
PD+
If the DTE needs to detect the PID/VID of module during the BIOS phase, the
detection time should exceed the T
Figure 3-7 Power off timing sequence
Table 3-6 Power off timing
Parameter
T
POFF
Issue V0.3 (2013-05-21)
Comments
POWER_ON_OFF turn on time.
POWER_ON_OFF Valid to USB
D+ high
PD+
Comments
POWER_ON_OFF turn off time.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Description of the Application Interfaces
Time (Nominal values)
0.5–1.0
12
time.
Time (Nominal values)
3.0–5.0
Units
s
s
Units
s
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Me909u-521Me909u-121Me909u-721

Table of Contents