System Start-Up Test - Amana AVZC20 Installation & Service Reference

Heat pump unit
Hide thumbs Also See for AVZC20:
Table of Contents

Advertisement

S
3. S
S
-
TEP
YSTEM
TART
NOTICE
O
-
,
N INITIAL POWER START
UP
E11,
SIGNALING THAT INITIAL
C
N
THE
OMFORT
ET
SETUP SCREEN TO ENTER APPLICATION
. S
C
INFORMATION
EE
OMFORT
.
DETAILED INFORMATION
A system test is now required to check the equipment
settings and functionality. Once selected, it checks the
equipment for approximately 5 - 15 minutes. System test
may exceed 15 minutes if there is an error. Refer to
the Troubleshooting section.
Before starting the SYSTEM TEST, turn off the electric heater
or gas furnace.
1. Ensure the thermostat is installed.
2. Apply power to outdoor and indoor units.
3. Start-up.
After the application information is entered,
the initial system test must be run.
NOTICE
F
H/P
OR INVERTER
SYSTEM USING
.
TRANSFORMER
The HOME screen will be displayed showing
information similar to one of the adjacent screens.
Select MENU.
NOTE: Either screen may be displayed.
SYSTEM TEST must be run for all installations.
System will not operate without a completed initial
SYSTEM TEST.
NOTE: Ensure the thermostat is in OFF mode.
T
UP
EST
THE OUTDOOR UNIT WILL DISPLAY CODE
SYSTEM
. F
TEST MUST BE RUN
OLLOW
-
UNIQUE
N
ET THERMOSTAT MANUAL FOR
C
N
,
NOT
OMFORT
ET
DO
INSTALL A
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents