Assemble base assemblies "A" and "B" using
3/8"-16 hardware. See Figure 2.
Install the three base insulator assemblies (with
pipe legs attached) on the base assemblies,
using 1/4"-20 hardware. See Figure 2.
Install the Three (3) 1 1/4" compression clamps
onto the pipe legs and position them near the
insulators as 'shown in Figure 2. Tighten the
clamps just enough to hold them in position.
Refer to Figure 5 for compression clamp
instructions.
Install the 1/4"-20 x 2 1/2" hex head bolts and
nuts on the bottom of each base insulator
assembly. This bolt will help to anchor each
leg in the concrete. See Figure 2.