Removal Of Electrical Box - Daikin ATXG25EV1B Service Manual

Removal procedure 2.5/3.5 kw class, indoor unit, inverter, wall mounted type, heat pump
Hide thumbs Also See for ATXG25EV1B:
Table of Contents

Advertisement

Removal of Electrical Box

9. Removal of Electrical Box
Procedure
Step
Remove the front grille.
1. Remove the electrical
box.
1
Loosen the screw of the
drip proof plate.
Lift and remove the drip
2
proof plate.
24
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Drip proof plate
Signal receiver
Discharge the static
electricity from your body
before touching the electrical
parts like signal receiver
Electrical
box
PCB.
It may cause malfunction of
PCB.
Limit
switch
(R5057)
(R3849)
When assembling, insert the
left hook of the drip proof
plate into the hem plate of
the heat exchanger.
Drip proof
plate
(R3850)
Si04-858
Points
(R3851)
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents