Inspections And Maintenance; Inspection And Maintenance Instructions - Alpha ARES Pro 150 Installation And Servicing Instructions

Floor standing, high water content condensing boilers
Hide thumbs Also See for ARES Pro 150:
Table of Contents

Advertisement

4
INSPECTIONS AND
MAINTENANCE
ATTENTION
before opening the combustion chamber, cool the
fibre.
Inspections and maintenance performed professionally
and according to a regular schedule, as well as the use
of original spare parts, are of the utmost importance
for fault-free operation of the boiler and to guarantee
its long life.
Yearly maintenance of the appliance is mandatory in
compliance with Laws in force.
Failure to perform Inspections and Maintenance can
entail material and personal damage
Table of resistance values based on the heating probe (SR) and the
heating return probe (SRR) temperature.
T°C
0
0
32755
31137
10
20003
19072
20
12571
12019
30
8112
7775
40
5363
5152
50
3627
3491
60
2504
2415
70
1762
1703
80
1263
1222
90
920
Relation between the temperature (°C) and nom. resistance (Ohm) of
the heating probe SR and the heating return probe SRR.
Example: At 25°C, the nominal resistance is 10067 Ohm
At 90°C, the nominal resistance is 920 Ohm
1
2
3
29607
28161
18189
17351
11493
10994
7454
7147
4951
4758
3362
3238
2330
2249
1646
1592
1183
1146
892
865
839

Inspections and maintenance

4.1
INSPECTION AND MAINTENANCE
INSTRUCTIONS
To assure long-term functioning of your appliance and to avoid altering
its approved status, only original Unical spare parts must be used.
If a component needs to be replaced:
• Disconnect the appliance from the electrical mains and make sure
that it cannot be reconnected accidentally.
• Close the gas shut-off valve upstream the boiler.
• If needed, and depending on the intervention to be carried out, close
any shut-off valves on the flow and return line of the heating system,
as well as the cold water inlet valve.
Once all maintenance operations are complete resume boiler operation
• Open the heating flow and return pipes, as well as the cold water inlet
valve (if closed previously).
• Vent and, if necessary, restore the heating pressure until reaching a
pressure of 0.8/1.0 bar.
• Open the gas shut-off valve.
• Switch the boiler on
• Make sure the appliance is gas tight and watertight.
4
5
6
26795
25502
24278
16557
15803
15088
10519
10067
9636
6855
6577
6311
4574
4398
4230
3119
3006
2897
2171
2096
2023
1539
1488
1440
1110
1075
1042
814
790
766
37
7
8
9
23121
22025
20987
14410
13765
13153
9227
8837
8466
6057
5815
5584
4069
3915
3768
2792
2692
2596
1954
1888
1824
1393
1348
1304
1010
979
949
744
722
701

Advertisement

Table of Contents
loading

Table of Contents