Omron E5AR-T Instruction Manual page 7

Digital controller
Hide thumbs Also See for E5AR-T:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation dimension diagram (units: mm)
48
S UB 1
S U B 2
S UB 3
S UB 4
WA I T
CH 2
CMW
MANU
OU T
OU T 2
R S T
R S P
L D
Panel work dimension diagram (units: mm)
45
+0.6
0
60 min.
Names of front parts
Operation indicators
Mode key
Level key
Function Key 1 /
Run/Reset Key
E5ER-T
11.5
3
F S P
PV
SV
PRG.
SEG
Installation panel
thickness is 1 to 8 mm.
Do not mount in a
contact mounting
(observe the
installation gaps).
If installing multiple
units, make sure that the
ambient temperature of
the apparatus does not
exceed the temperature
specifications.
S UB 1
S UB 2
S UB 3
S UB 4
WA I T
F S P
PV
Indicator 1
SV
Indicator 2
CH 2
PRG.
CMW
SEG
Indicator 3
MAN U
OU T
OU T 2
R S T
R S P
L D
Up key
Down key
Function key 2
Terminal cover (optional)(Model E53-COV15)
110
95
2
Installation procedure
(1) For a watertight
installation, insert the
watertight packing.
Set the input type setting
switch on the side of the
Digital Controller
according to the input
type being used.
(2) Insert the E5ER into the
mounting hole in the panel.
(3) Insert the provided fittings
into the mounting slots at
the top and the bottom of
the rear case.
(4) Tighten the top and the
b o t t o m f i t t i n g s c r e w s
alternately little by little (so
that they remain balanced)
until the ratchet stops
engaging when turning.
Crimp terminal size: M3
(1) Watertight packing
(Model Y92S-P5)
(3)
(4)
(2)
E R
E 5
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5er-t

Table of Contents