Installation of this unit
Power supply installation
Installing the TDK-Lambda DC12 V/24 V power supply unit.
Preparing the power source
1
Push the power supply unit (PSU) into the
power shelf rack until the lock engages.
Power supply unit
(PSU)
Power supply unit lock
Adjusting the voltage
1
Use a 1.8 mm (0.07q) width flat-blade
screwdriver or similar tool to turn the
adjustment trimmer clockwise until you hear a
click to set the correct voltage.
≥ Initially the adjustment trimmer is set to about j13% of
the correct voltage.
Power shelf rack
Adjustment trimmer
43