Site Preparation - Air Burners BurnBoss T22 Operating Manual

Equipped with kubota z482-e3 diesel engine, trailer mounted refractory walled air curtain burner
Table of Contents

Advertisement

SITE PREPARATION

THE GOALS TO GOOD SITE PREPARATION ARE:
To place the FireBox for easy access.
To sort the waste wood pile.
To organize the inflow of new wood waste.
When locating the FireBox;
1) Consider access for your truck and trailer to load and unload the FireBox. Ensure
there is enough room to maneuver your truck and trailer.
2) Consider where the waste piles will be located. We generally recommend two
waste piles (explained in next section).
3) Consider the predominate wind direction. Hot embers will be escaping from the
FireBox during all burning operations.
4) Consider clearances to empty the FireBox. The unit must raised and towed forward
until all the ash remains behind. When emptying, the tires can not come in contact
with the hot embers or they will be damaged. In most cases cold ash can be reapplied
to the land. Check your local ordinances.
5) Once the box is in position, it is important to place dirt around the inside bottom of
the FireBox where the thermo ceramic panels meet the ground to "seal" the bottom.
This will prevent smoke and heat from escaping. Pay particular attention to the seal
between the tires and firebox and between the front wall and engine bay.
DANGER:
Never dig a pit in the center of the FireBox. This will allow high level
heat to destroy the bottom of the FireBox, voiding the warranty.
DANGER:
This machine DOES NOT prevent hot embers from escaping.
This machine is designed primarily as a pollution control device to reduce
the smoke generated from burning clean wood waste.
BurnBoss Series Air Curtain Burner (Kubota Z482-E3 Engine)
Page 15 of 27
Air Burners, Inc.
OPERATING MANUAL
(Vers. 08.08.2017)

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Air Burners BurnBoss T22

This manual is also suitable for:

Burnboss t24

Table of Contents