Download Print this page

Toshiba CV-10HA Instruction Manual page 14

High-voltage vacuum contractors, motor & transformer application, 12/15kv-320a-5/4ka
Hide thumbs Also See for CV-10HA:

Advertisement

TOSHIBA
1 1 .
INSPECTION AND MAINTFNACE
To maintain the function and performance of the vacuum contactor for a long period
of time, the following inspections and maintenance procedures are recommended.
The intervals between inspections may vary depending on the conditions of use and
the environment under which the contactor is used. The initial inspection should be
carried out within one year of the start of equipment operation, and the succeeding
check intervals should be determined according to the result of the initial inspection.
See Section 2 for use under special environment as in outdoor cubicles.
(1) Patrol Inspection(every l-6 months)
With the cubicle energized, visually check from out side the cubicle according to
the check list of Table 45.
WARNING : When opening the door of the cubicle, do not come close
Abnormal noise
Abnormal smell
to danger area.
Table 4
Check item
Table 5
Patrol inspection items(cont.)
Patrol inspection items
What to check
Check if corona discharges or operation
magnets are not
Check if corona discharges or overheat are
not producing abnormal smell.
Is there not any discoloration due to
13

Advertisement

loading

This manual is also suitable for:

Cv-10hal