Download Print this page

S-Box Mini-TR Instructions And Installation Manual page 4

2-port pop-up socket box

Advertisement

This collar adjustment creates the required clearance below the new custom top - so it is has the press-down
space underneath to engage and disengage the catch mechanism inside the unit. (See
3/16" clearance
2/16" collar
STAGE 2 (Preparing the rebate)
STAGE 2 – Cutting the holes and Custom top
There are 2 ways of installing the S-Box™ below the work-surface. Both involve the creation of a rebate at -
20mm (13/16") datum. The method you chose depends entirely on the thickness of the worktop material:
>For 30mm material and above (e.g. Granite) - the rebate is made within the material itself.
>For 20mm material (e.g. Quartz) - the rebate is "created" using a second material below it (e.g. MDF)
'TRUE' REBATE in 30+ mm (1+3/16") material:
Firstly cut the standard primary hole for insertion of the box itself (= DIMENSIONS
as described above:
A
98mm
X
(We suggest an 8mm radius setting for this primary cut)
3¾" x 8¼"
A
Then create a further 8mm (5/16") wide rebate at 20mm (13/16")depth from the top of the work-surface, on
which to mount the S-Box, and its collar, in its new position. The radius of the collar's corners is 7/16", so we
½ "
suggest that you use a
5/16"
(A+10/16") x (B+10/16)
Note:
MAX THICKNESS OF ANY
CUSTOM TOP IS ½"
B
A
211mm (2-port)
115mm x
B
Primary hole
radius tool for the rebate-routing process.
A x B
B
425mm (storage units)
4½" x 16¾"
r 5/16"
13/16"
below)
½"
13/16
A
B
x
)
Outer rebate.
"

Advertisement

loading