Engine And Frame Group - 9Hp Electric Start - Simplicity 960 Parts Manual

9hp large frame two-stage snowthrowers
Hide thumbs Also See for 960:
Table of Contents

Advertisement

Engine and Frame Group - 9HP Electric Start

NOTE: Unless noted otherwise,
use the standard hardware torque
specification chart.
2
Long hub of idler pulley
(Ref. 19) to be toward
idler arm (Ref. 16).
38
37
Torque to
10-14 ft. lbs. or
14-20 N m
36
33
34
35
The above parts group applies to the following Mfg. Nos.:
1694439 - 960E
© Copyright
2003
Simplicity Manufacturing, Inc. All Rights Reserved.
Position idler pulley (Ref. 25)
at center of slot in clutch arm
(Ref. 22).
1
Use 0-2 washers
between Ref. 40
& 22 to assure a
centered belt and no
interference between
pulleys Ref. 19 & 25.
40
39
39
18
18
23
22
20
19
21
18
16
17
15
49
48
51
31
29
32
Right rear bolt.
Position belt stop (Ref. 33)
1/16 to 1/8 inch from belt
when auger clutch is engaged.
3
25
26
4
39
27
21
24
14
13
28
29
42
43
30
41
8
5
6
Hook one end of spring (Ref. 27)
over clutch rod assembly (Ref. 22)
between tabs and other end into
slot in frame.
7
44
46
8
10
9
8
11
Hook one end of spring (Ref. 15)
into top hole of roller arm (Ref. 16)
and other end into top hole of the idler
arm assembly in the Traction Drive Group.
TP 400-3890-01-LW-S
986367
45
50
47
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

960m960e

Table of Contents