Download Print this page

Installation Instructions; Operating Instructions - Eversan 9665 Instruction Manual

Hockey scoreboard

Advertisement

console on. If you are operating multiple scoreboards with one console you must power all the
scoreboards prior to turning on the console. If you are operating multiple scoreboards with multiple
consoles. You must turn power on to one scoreboard and then the console you want to use to
operate that scoreboard. This allows each system to set automatically so as not to interfere with
each other.
8. Go to operating instructions to test scoreboard.

Installation Instructions

1. It is recommended that a professional sign company be hired to install the scoreboard. SEE
DRAWINGS
2. Eversan recommends a minimum depth of 5 ft. and a 2ft. footer diameter.
3. Calculate the wind loading by standard formula for height and dimension of sign.
NOTE: Check local codes for your area.
4. Prepare and sink I-beams, W6 x 15 I-Beam conforming to ASTM A36 recommended minimum,
align with plumb line and careful measurements.
5. Determine height of lowest point for scoreboard. Mark and align on all mounting beams parallel to
visual ground sighting.
6. Drill and bolt (3/8 hardened bolts) or weld provided bottom Z-brackets to the posts as shown in the
installation diagram.
7. Lift scoreboard set onto Z bracket. Secure temporarily with a clamp.
8. Place the top Z-brackets on the board and install in the same manner as the lower.
9. The board is now ready to be wired.
Electrical Specifications: Electric outlets for scoreboards are always on a "clean" unused, switched
breaker box. Pay close attention to the power source and connections. It is recommended that a
key-switch or switched breaker box be used to turn off the system at the end of use each day. The
scoreboard should always be powered down when not in use.
Power Requirement: 120VAC @ 1 amp. Eversan, Inc. recommends using a 10-amp, GFCI, breaker
for outdoor scoreboard power.
Optional Battery: 12VDC 7AH rechargeable battery may be purchased to use with this scoreboard.
The four-pin round connector on the left side of scoreboard is the input for DC power.
CAUTION: (Cabled System Only) The data cable is a pre-wired, 2 conductor shielded, 22GA
stranded cable. Any cable splicing should be color-coded or failure of the computer power supply will
result. Continuity of the shield is essential in reducing possible damage due to lightening.
.
Setting the Time: To set the time the clock must be stopped. Press and release the TIME button
EVERSAN, INC. • 34 Main Street, Whitesboro, NY 13492 • 1-800-383-6060 Fax: 315-736-4058
EVERSAN
Page 2
INSTRUCTIONS FOR WIRING
(See Installation Diagram)

Operating Instructions

www.eversan.com

Advertisement

loading