2 INSTALLATION
This section provides the installation procedures for the RIU. Installation of the various
Digivance ICS units may proceed separately from the installation of the RIU.
2.1 Tools and Materials
The following tools are required in order to complete the procedures in this section:
•
Box cutter
•
Pencil or scribe
•
Medium and small size flat-bladed screwdrivers
•
Phillips screwdriver (#2)
•
TORX screwdriver (T20)
•
Wire cutters
•
Wire stripper
•
Tool kit for attaching N-type male connectors to coaxial cable
•
Drill and assorted drill bits (wall-mount installations only)
The following materials are required in order to complete the procedures in this section:
•
Wall-mount fasteners (wall-mount applications only)
•
#22 AWG (0.40 mm) category 3 or 5 cable (for external alarm connections)
•
#18 AWG (1.00 mm) insulated stranded copper wire (for chassis grounding wire)
•
Ring terminal for #18 wire (for chassis ground wire connection)
•
High performance, flexible, low loss 50-ohm coaxial cable
•
N-type male connectors
•
Wire ties
2.2 Unpacking and Inspection
This sub-section provides instructions for opening the shipping boxes, verifying that all parts
have been received, and verifying that no shipping damage has occurred. Use the following
procedure to unpack and inspect the RIU:
1. Open the shipping carton and carefully unpack the RIU from the protective packing
material.
2. Check the RIU for broken or missing parts. If there are any damages, contact ADC (see
section 5 at the end of this manual) for an RMA (Return Material Authorization) and to
reorder if replacement is required.
ADCP-75-114 • Issue C • June 2001
© 2001, ADC Telecommunications, Inc.
Page 7
Need help?
Do you have a question about the DIGIVANCE and is the answer not in the manual?
Questions and answers