Orifice Installation; Txv Installations - York THGD Series Installation Manual

R-410a outdoor split-system heat pump
Table of Contents

Advertisement

SECTION IV: ORIFICE INSTALLATION
Failure to install Schrader Valve Core on orifice applications could
result in total refrigerant loss of the system!
Install Schrader Valve Core and Orifice as follows:
1. Relieve the holding charge by depressing the Schrader valve stem
located in the end of the liquid line. Cut the spundown copper to
allow installation of the suction line.
2. Slide indoor coil out of cabinet far enough to gain access to equal-
izer fitting on the suction line.
3. After holding charge is completely discharged remove black plastic
cap on equalizer fitting.
4. Install Schrader Valve Core supplied with the outdoor unit into equal-
izer fitting using a valve core tool.
5. Loosen and remove the liquid line fitting from the orifice distributor
assembly. Note that the fitting has right hand threads.
6. Install proper size orifice supplied with outdoor unit. Refer to sup-
plied Tabular Data Sheet for specific orifice size and indoor coil
match up.
7. After orifice is installed reinstall the liquid line to the top of the orifice
distributor assembly. Hand tighten and turn an additional 1/8 turn to
seal. Do not over tighten fittings.
8. Leak test system.
9. Replace black plastic cap on equalizer fitting.
10.Slide indoor coil back into cabinet.
FIGURE 5: Orifice Installation
SECTION V: TXV INSTALLATIONS
For installations requiring a TXV, the following are the basic steps for
installation. For detailed instructions, refer to the Installation Instructions
accompanying the TXV kit.
Install TXV kit as follows:
1. Relieve the holding charge by depressing the Schrader valve stem
located in the end of the liquid line. Cut the spundown copper to
allow installation of the suction line.
2. After holding charge is completely discharged, loosen and remove
the Schrader cap seal.
Johnson Controls Unitary Products
LIQUID LINE
SWIVEL COUPLING
(This fitting is a right-hand thread,
turn counter-clockwise to remove)
ORIFICE
DISTRIBUTOR
3. Loosen and remove distributor cap seal.
4. Install the thermal expansion valve to the orifice distributor assembly
with supplied fittings. Hand tighten and turn an additional 1/4 turn to
seal. Do not overtighten fittings.
5. Install the liquid line to the top of the thermal expansion valve with fit-
ting supplied with the liquid line. Hand modify the liquid line to align
with casing opening. Hand tighten the liquid line and an additional 1/
4 turn to seal.
6. Install the TXV equalizer line into the vapor line as follows:
a.
Hand tighten the 1/4" SAE nut to the Schrader fitting and an
additional 1/3 turn to seal.
7. Install the TXV bulb to the vapor line near the equalizer line, using
the bulb clamp(s) furnished with the TXV assembly. Ensure the bulb
is making maximum contact.
a.
Bulb should be installed on a horizontal run of the vapor line if
possible. On lines under 7/8" O.D. the bulb may be installed
on top of the line. With 7/8" O.D. and over, the bulb should be
installed at the position of about 2 or 10 o'clock.
b.
If bulb installation is made on a vertical run, the bulb should
be located at least 16" (40.6 cm) from any bend, and on the
tubing sides opposite the plane of the bend. The bulb should
be positioned with the bulb tail at the top, so that the bulb acts
as a reservoir.
c.
Bulb should be insulated using thermal insulation provided to
protect it from the effect of the surrounding ambient tempera-
ture. Cover completely to insulate from air-stream.
In all cases, mount the TXV bulb after vapor line is brazed and has
had sufficient time to cool.
Schrader valve core MUST NOT be installed with TXV installation.
Poor system performance or system failure could result.
Dry nitrogen should always be supplied through the tubing while it is
being brazed, because the temperature is high enough to cause oxi-
dation of the copper unless an inert atmosphere is provided. The flow
of dry nitrogen should continue until the joint has cooled. Always use
a pressure regulator and safety valve to insure that only low pressure
dry nitrogen is introduced into the tubing. Only a small flow is neces-
sary to displace air and prevent oxidation.
All connections to be brazed are copper-to-copper and should be
brazed with a phosphorous-copper alloy material such as Silfos-5 or
equivalent. DO NOT use soft solder.
Install the TXV bulb to the vapor line near the equalizer line, using the
two bulb clamps furnished with the TXV assembly. Ensure the bulb is
making maximum contact. Refer to TXV installation instruction for view
of bulb location.
In all cases, mount the TXV bulb after vapor line is brazed and has
had sufficient time to cool.
835961-UIM-D-0213
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents