Installation - Rapid-Air SA3 Operating Instructions Manual

Stock straighteners
Table of Contents

Advertisement

INSTALLATION

Your straightener is fully assembled and ready to be put
1.
into position. Visually inspect unit for damaged or loose
parts due to shipment. If there is physical damage contact
carrier.
Install your straightener on a level surface with sufficient
2.
clearance for loading material and adjusting the roller
pressure for straightening. Align and center your unit to
the device that will be supplying the stock. For safe operation,
bolt unit to the floor. Before bolting your unit to the floor, check
for the longest feed length and position your straightener so
that there will be about two or three feed lengths in the storage
loop without re-inducing coil set in the material.
3.
Before inserting material into your straightener, turn on the main
power button and run a test cycle using the jog button. Also run
a test cycle in the run mode using the dancer arm to test that the
speed varies if using the proportional control. Test all other
electrical features before continuing.
Once these tests have been completed and all the functions are
4.
working properly, your straightener can now be used for what it
was designed to do and that is to remove coil set.
CAUTION - Disconnect electrical power before performing
any service to this machine.
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb4Sa3mSb4m

Table of Contents