Samsung 5G CPE Installation Manual page 20

Outdoor cpe
Hide thumbs Also See for 5G CPE:
Table of Contents

Advertisement

Number
Name
13
Nipper
14
LAN Tool
15
Industrial Scissor
16
Knife
17
Multi tester
18
Compass
19
Heating Gun
20
Hammer
The required installation tools may vary depending on the site conditions.
In addition to the basic tools, protractor, ladder, safety equipment, and cleaning
tools must also be arranged, considering the site conditions.
5G CPE Outdoor Installation Manual v1.0
Copyright © 2018, All Rights Reserved.
Specification
Basic Tool
Basic Tool
Basic Tool
Basic Tool
Digital Pocket Tester
Normal
50-300°C
Normal
Confidential
Chapter 1 Before Installation
Purpose of use
For cutting cable
RJ45 crimper
Cutting
Cutting
To measure voltage and current to
detect cable disconnection
Check azimuth during installation
Shrinking Heat Shrink Tube
Anchor fixing
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents