Napoleon Dynamic Heat Control LVX38 Installation Manual page 20

For indoor use only
Table of Contents

Advertisement

Available languages

Available languages

finish framing - after appliance installation
EN
see-thru built out
Insulation
minimum framing
Ref
E
16 3/16" (41.1cm)
14 1/4" (36.2m)
N* / **
O*
25 11/16 (65.2cm)
4" (10.1cm) Max
P*
* Thickness of finishing material must be considered when constructing the framing for the protrusion (i.e. Dimen-
sions such as N, O, & P includes framing and finish material). If desired, side and bottom protrusions are also
permitted with 4" (10.1cm) Max. (finishing material not illustrated)
** This is a recommended dimension when mounting electronics above the appliance. Otherwise, it can be as
minimal as construction permits.
note:
When finished, protrusions must never encroach inside the appliance finishing flange as this will impede
the fitment of the safety barrier and safe operation. See "finishing" section in the installation manual.
20
W415-1739 / C / 08.03.17
N
O
E
LV38-1
LV50-2
16 3/16" (41.1cm)
14 1/4" (36.2m)
25 11/16 (65.2cm)
4" (10.1cm) Max
Drywall
P
LV62
16 3/16" (41.1cm)
14 1/4" (36.2m)
25 11/16 (65.2cm)
4" (10.1cm) Max
note:
Finish framing must be built
after appliance has been
placed in its final position and
venting connected.
Option 2 illustrated (appliance
not shown)
LV74
16 3/16" (41.1cm)
14 1/4" (36.2m)
25 11/16 (65.2cm)
4" (10.1cm) Max

Advertisement

Table of Contents
loading

Table of Contents