Furuno DS-50 Installation Manual page 33

Doppler speedlog
Hide thumbs Also See for DS-50:

Advertisement

2. Cable between transceiver unit, junction box and
processor unit (TTYCY-19S)
5 10
Anticorrosive
sheath
Cable clamp
Rubber gasket
1) Transceiver unit/junction box
shield
Insulating
     tubing
Vinyl sheath
Taping
Figure 5-2 Cable fabrication
2) Processor unit
Cores and shields are fabricated the same as on
transceiver unit/junction box side. To ground the cable,
remove paint from the armor and set the armor in the
cable clamp.
Cable clamp
Figure 5-3 Cable fabrication
Note: 1. Unravel shield
FV1.25-4
              only near
 terminal strip.
          2. Fold back armor
 onto washer and
 insert between
 washer and
 gland.
Washer
Armor
26