Test Run; Checks Before Test Run; Test Run Procedure - LG MULTI V MINI ARUN047GS2 Installation Manual

Hide thumbs Also See for MULTI V MINI ARUN047GS2:
Table of Contents

Advertisement

Test Run

Checks before Test Run

1. Test run should be performed after auto-addressing
2. Test run can be performed when 3 minutes passed after power on, by DIP switches and buttons. -
needs time for initializing data of micom and readying communication with indoor unit.
3. 7-segment of outdoor unit displays test run status and error.
4. During test run, if error occurs, then test run ends and proceeds final stage of test run - sys-
tem should be initial status by initializing all data of test run pressing black button for 2 seconds after
all DIP switch off
5. In case of finishing test run during test run, press black and red button simultaneously for 5
seconds.
6. When test run is finished, indoor units are stopped and 938 is displayed after 90 seconds.
7. To perform FDD logic test, proceeds when 3 minutes passed after reset.

Test Run Procedure

Step 0. Check order signal
Select the function of tust run
Step 1. Sensor checking
Check sensor abnormality.
Step 2. Refrigerant auto charging
In case of adding additional refrigerant, this function helps adding refrigerant automatically.
Step 3. Refrigerant checking
Check refrigerant amount is proper.
Test Run
Installation Manual 53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v mini arun036gs2Multi v mini arun053gs2

Table of Contents