Van Norman FG5000 Instruction Manual And Parts List page 31

Flywheel grinder
Table of Contents

Advertisement

SETTING UP FLYWHEEL (continued)
3. Clean table and lay proper flange adapter on table. Use the largest possible flange adapter
for maximum support.
contacting the flange adapter (Figure 20).
4. Choose proper size centering cone to fit center hole in flywheel. (Figure 21) Select correct
length centering cone bolt. Secure to table by tightening centering cone bolt. If exact
centering is necessary such as on some recessed flywheels, a dial indicator may be used.
5. Position grinding wheel over friction surface to be ground and lock grinding head in place by
pulling headlock handle on left side of head downward. POSITION WHEELGUARD FOR
MAXIMUM OPERATOR PROTECTION.
6. Replace shroud cover and actuate grinder motor, table motor and coolant pump. Direct
coolant onto workpiece so it flows under the grinding wheel. Regulate amount of coolant
flow by adjusting valve on rear of shroud. NEVER GRIND WITHOUT ADEQUATE
COOLANT FLOW.
Van Norman
5000/10000 FLYWHEEL GRINDER
Place flywheel onto table with crankshaft mounting surface
27.
888-855-1789

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fg10000

Table of Contents