Installation And Commissioning; Preparation; Mounting In The Field; Grounding At Housing - Pepperl+Fuchs VisuNet GMP RM/PC 200 series Hardware Manual

Table of Contents

Advertisement

VisuNet GMP RM/PC 200 series

Installation and Commissioning

3
Installation and Commissioning
3.1

Preparation

Unpacking the unit
1. Check that all package contents are present and undamaged.
If anything is damaged, inform the shipper and contact the supplier.
2. Check that all items are present and correct based on your order and the shipping
documents.
If you have any questions, please contact Pepperl+Fuchs.
3. Keep the original packing material in case you need to store or ship the unit at a later time.
3.2

Mounting in the field

The device is licensed for operation in confined spaces.
The cooling of the device does not require active components like CPU fan or water cooling
systems. For that reason there are no ventilation slots in the housing.
To avoid overheating during operation, follow the advices below for field installation:
Do not expose the device to direct solar radiation or other heat sources.
Since the heat will dissipate via the housing, provide sufficient air circulation.
Keep the ambient temperature below the specified maximal value.
Note!
The device is not delivered in sterile condition.
3.2.1

Grounding at housing

Note!
Pepperl+Fuchs recommand to use a cable with a core-cross section of 4 mm
Figure 3.1
Ground connection at housing
2
for grounding.
27

Advertisement

Table of Contents
loading

Table of Contents