AUTOMATIC POOL FILLER
INSTALLATION MANUAL
Prior to installation, check local building codes for exceptions to these
1. Install leveler bucket so top of bucket is flush with bond beam of pool (See Fig. A). Ring and
Lid then should be installed flush with deck. Use rebar mounting flanges provided on bucket
to insure and aid in keeping bucket level during concrete pour.
2. Install 1½" equalizer pipe. IMPORTANT: Equalizer pipe must be straight, as shown in
Figure A. The use of any 45
only PVC to ABS joint cement for this application.
3. Connect 3/4" fresh water supply pipe to side leveler bucket. (See Fig. A). Special Note:
Please allow adequate cure time as per cement manufacturer before applying pressure.
4. You can pressure test auto-fill with supplied fitting P/N 210067. (See Fig. D). CAUTION: Do
not over tighten.
5. Remove test plug and flush supply line for approximately 60 seconds or until all debris has
cleared.
6. Connect 3/4" overflow pipe in port (See Fig. A), using a PVC to ABS joint cement.
7. Install valve assembly, Fluidmaster
sealers. Pentair Water Pool and Spa, Inc. does not cover warranty if damaged because
of over tightening or cross threading.
8. To adjust float height of Fluidmaster
hand, while turning clockwise or counter-clockwise to adjust valve. Continue turning until
water level is achieved. (See Figure E).
Rev. B 6-26-06
Model # T40-F
Installation Instructions
instructions.
or 90
pipe could cause air lock and void warranty. Use
°
°
®
valve. IMPORTANT: Do not use liquid or paste
®
valve, lightly press down the top of fill valve with one
www.pentairpool.com
®
P/N YYLEVF
Need help?
Do you have a question about the T40-F and is the answer not in the manual?
Questions and answers