Further Technical Documents - Bosch CHP CE 240 NE Technical Manual

4-draught steam boiler and chp with mec system
Table of Contents

Advertisement

Item
Description
2.5
Ventilation
2.5.10
Supply air duct
2.5.20
Multi-leaf damper
2.5.30
Weather grille
2.5.40
Extract air fan
2.5.50
Exhaust air duct
2.5.60
Multi-leaf damper
2.5.70
Weather grille
3
Electrical installation (KG 440)
3.1
Electrical installation
cable between boiler and CHP control cabinet and electrical
3.1.10
Components
3.1.20
Cable route
3.1.30
NS/MS infeed
4
MSR (KG 480)
4.1
control cabinet
4.1.10
Control cabinet for all components
4.1.20
Higher level control MEC Control
4.1.30
Bosch CHP control
4.1.40
Bosch steam boiler control
4.1.50
Superordinate sequential control (further CHP or steam boilers)
4.1.60
Superordinate emergency stop chain
5
Other
5.1
Extra works
5.1.10
Commissioning
5.1.20
Initial filling, equipment
5.1.30
Maintenance/service
Table 17 List of components
4.2

Further technical documents

Observe the following "Technical Information":
• TI024: Requirements of the boiler installation room –
Information for the installation of boilers and boiler
house components
• TI041: Requirements to the waste heat generating
power unit in conjunction with a downstream waste
heat steam generator for waste heat utilisation
• TI074: Information on installation of CHP system with
external waste heat utilisation
Systemlösung – 6 720 885 509 (2018/03)
Supplier
Bosch
CHP
Boiler
External
x
x (opt.)
x (opt.)
x (opt.)
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Appendix
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents