Download Print this page

Danfoss VLT Series Installation Manual page 4

24 v dc supply
Hide thumbs Also See for VLT Series:

Advertisement

Installation Guide | VLT® 24 V DC Supply MCB 107
Procedure
1. Disconnect power to the drive.
2. Disconnect power to the live part connections on the relay terminals.
3. Remove the LCP or the blind cover.
4. Remove the terminal cover.
5. Remove the control cables.
6. Remove the cable decoupling plate.
For enclosure sizes A2 and A3, also remove the plastic cover underneath the decoupling plate (if installed).
7. Insert the option in the D-option slot.
8. Mount the cable decoupling plate.
9. Connect the control cables and relieve the cables with the enclosed cable strips.
10. Attach the terminal cover and the LCP, or the blind cover.
11. Connect power to the drive.
Example:
1 LCP
3 Cable decoupling plate
5 D-option slot
Illustration 2:
Installing a D-Option in an A2/A3 Enclosure
4 | Danfoss A/S © 2018.11
5
4
3
Scope of Delivery, Safety, and Installation
1
2
2 Terminal cover
4 D-option
AN287957936346en-000101 / 130R0308

Advertisement

loading

This manual is also suitable for:

Mcb 107Fc 102Fc 202Fc 302Fc 301Vlt fc 103