Kenmore POWER MISER 153.335803 Owner's Manual page 17

Power vent gas water heater
Table of Contents

Advertisement

Installation
Instructions
(cont'd)
VENTING
SYSTEM EXAMPLE
INSTALLATIONS
FOR ALL MODELS (cont'd)
2. Horizontal runs require a minimum ¼" rise per foot.
35' Max.
16" MIN.
13" MIN.
Min. rise ¼"
I1" MIN.
per foot
3. A vertical run can be no more than 20'.
4. The total vertical and horizontal run cannot exceed 35'.
Min. rise ¼"
One Elbow
perfoot
Ma_ 20'
TOTAL VERTICAL AND
HORIZONTAL RUNS
CANNOT EXCEED 35'
I
I
T
Max.20'
I
Min. rise ¼"
per foot
Min. rise ¼"
per foot
TOTAL VERTICAL AND
HORIZONTAL RUNS
CANNOT
EXCEED 35'
17
CEMENTING PVC, ABS OR CPVC PIPE AND FITHNGS
Read and observe all safety information
printed on primer,
cleaner, and cement containers.
DANGER
Primer, cleaner, and cements are extremely flammable.
They are harmful or fatal if swallowed. The vapors are
harmful. They may irritate
eyes and skin and can be
absorbed through the skin.
PRECAUTIONS
Always store primers, cleaner, and cements in cool, dry,
well ventilated places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well ventilated areas. Wear impervious clothing while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting, and call a physician or poison
control center immediately. If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of
eye and skin contact, immediately flush with plenty of
water for 15 minutes and seek medical attention if irri-
tation persists. KEEP OUT OR REACH OF CHILDREN.
All primers, cleaners, and cements must meet all local codes and
applicable
standards
of the American
Society
For Testing
Materials Standards.
Before using primers,
cleaners, and cements, stir or shake, mak-
in
sure contents
are liquid. Do not use if found to be lumpy or
jei_;-like.
1. Cut pipe ends squarely removing all burrs and dirt.
2. Dry fit pipe and fittings to be connected
for proper fit.
3. Clean pipe and fitting with a primer/cleaner.
4. Apply a thin coat of cement
to fitting,
avoiding
puddling
inside.
5. Apply a liberal coat of cement to pipe leaving no voids.
6. QUICKLY
assemble parts while cement
is fluid! If you wait
too long, re-coar pipes.
7. Push pipe completely
into socket of fitting, turning
as it goes
until it bottoms.
8. Hold pipe and fitting together for 30 seconds. Then carefully
clean off excess with a cloth. Allow connections
a sufficient
time to cure before disturbing.
9. Remember
that vent pipes must be adequately
and securely
supported.
APPROXIMATE
SETTING
TIME
FOR 2½" TO 4" PIPE
OINTS
MOVEMENT
COMPLETE
OF JOINT
SET
90°F to 150°F
3Ahr.
8 hrs.
50°F to 90°F
1 hr.
15 hrs.
0°F to 50°F
1_ hr.
18 hrs.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents