Page 7
PRODUCT DATA “Product Features and Benefits” on page 8 “Unit Nomenclature” on page 9 “General Data” on page 10 “Electrical Data” on page 13 “Dimensions” on page 14 “Acoustic Data” on page 21 “Air Velocity and Temperature Distribution” on page 23 “Refrigerant Flow Diagrams”...
Although we believe that these building ventilation methods have been portrayed accurately, none of the methods have been tested, verified, or evalu- ated by LG Electronics, U.S.A., Inc., In all cases, the designer, installer, and contractor should understand if the suggested method is used, it is used at their own risk.
Page 72
Pipe Sleeves at Penetrations LG requires that all pipe penetrations through walls, floors, and pipes buried underground be properly insulated and routed through an ap- propriate wall sleeve of sufficient size to prevent compression of refrigerant pipe insulation and free movement of the pipe within the sleeve.
Page 75
Check the fit of the insulation jacket after the header fitting and all run-out pipes are installed. Mark all pipes at the point where the insulation jacket ends. Remove the jacket. Install field provided insulation on the run-out and main trunk pipes first. Install the LG-pro- vided insulation plugs on the ends of all unused header ports.
Page 84
20001747 ISO 9001: 2008 LG ELECTRONICS INC. LG Electronics Commercial Products Support 1-888-865-3026 USA Follow the prompts for commercial A/C products. LG Electronics, U.S.A., Inc. Commercial Air Conditioning Division EM_SZ_Cassette_12_18 4300 North Point Parkway Supercedes: EM_SZ_Cassette_11_18 Alpharetta, Georgia 30022 : EM_SZ_Cassette_8_17 www.lg-dfs.com...