Download Print this page

Jindara Hamersley Mk2 Insert Installation Instructions Manual page 5

Advertisement

Hamersley Mk2 Insert
Installation
Installation
(continued)
(Continued)
Rear liner
Side liner
Final inspection prior to use
Ensure the ba e plate is rmly located.
Ensure cast iron liners – side and back – are positioned correctly.
Ensure re bricks are sitting at and covering entire base.
Ensure ash de ector is positioned correctly.
Check fan cord has not been damaged during transit.
Plug in fan cord and ensure cord does not touch stove surface.
Check all door seals are tting correctly.
Flue and chimney requirements
The ue pipe shall extend not less than 4.6m above the top of the oor protector. Note: Installation must be
carried out by a licensed installer in accordance with AS/NZS 2918:2001.
3000mm
Any nearby
structure
Increase as
necessary
until
nothing
within
3000mm of
ue top
Ba e Plate
Cast Iron Liner
Ash De ector
Fire Bricks
3000mm
More than 3000mm
or less
600mm min
3000mm
1000mm
min if clear
within
3000mm of
ue top
3000mm
More than 3000mm
or less
600mm min
3000mm
Increase from
1000mm min
until clear
within 3000mm
of ue top
8
Hamersley Mk2 Insert
Installation
(continued)
ZCV installation notes
• Select the position that you wish to install your ZCV, carefully allowing for ue clearances of 305mm in the roof
cavity (the outer ue being 255mm requires a 25mm clearance on either side to combustibles, making overall
clearance of 305mm).
• Place hearth (cement bre sheet) under the position desired for the zero box. Place the zero box into position.
• Fit ue upstands to zero box.
• Fit ue to the upstands and terminate at the required height above the roof line.
• Fit 300mm x 100mm vermin proof vent directly behind where the zero box will be located, as near as
practicable to the oor. This vent will allow air access to the zero box either from another room or external air.
Note: If installed on a timber oor, an additional two vents are required. i.e. either through the oor, one each
side of the ZCV, or alternatively, through the side wall(s) if applicable.
• Build your frame around the ZCV maintaining the clearances listed above.
• Cover the front with a 4mm cement sheet or non-combustible material for the rst 300mm above the
appliance.
e.
• Insert your Jindara Hamersley Insert into the ZCV. It is important that the base of the appliance is sitting on 2x
galvanized C-section strips supplied with ZCV. These strips allow a correct installation height and fresh air to
circulate around the appliance base.
• Install the mantle if required. Note: If mantle is made out of combustible material the following dimensions
must be adhered to.
Minimum 4mm thick
cement sheet, villaboard
or non-combustible
material on front face
of framing.
Non-combustible
hearth
Tripleskin Flue
Vent may be located
in the wall or on the
oor.
Figure 3. ZCB Installation Step 1.
5

Advertisement

loading

This manual is also suitable for:

Kimberley m3 insert