This illustration shows all control terminals of the frequency converter. Applying Start (term. 18) and an analog reference (term. 53 or 60) make the frequency
converter run.
3
Illustration 3.7: Overview of control terminals in PNP-configuration and factory setting.
3.5 Switches
NB!
Do not operate switches with power on the frequency converter.
Bus termination:
Switch BUS TER pos. ON terminates the RS485 port, terminals 68, 69. See
power circuit drawing.
Default setting = Off.
S200 Switches 1-4:
Switch 1:
*OFF = PNP terminals 29
ON = NPN terminals 29
Switch 2:
*OFF = PNP terminal 18, 19, 27 and 33
ON = NPN terminal 18, 19, 27 and 33
Switch 3:
No function
Switch 4:
*OFF = Terminal 53 0 - 10 V
ON = Terminal 53 0/4 - 20 mA
* = default setting
Table 3.3: Settings for S200 Switches 1-4
16
AF-60 LP™ Micro Drive Operating Instructions
Illustration 3.8: S640 Bus termination.
Illustration 3.9: S200 Switches 1-4.
NB!
Parameter 6-19 must be set according to Switch 4 position.