Mechanical Installation; Before Starting - GE Consumer & Industrial AF-60 LP Operating Instructions Manual

Micro drive
Table of Contents

Advertisement

2 Mechanical Installation

2.1 Before Starting

2.1.1 Checklist
When unpacking the frequency converter, make sure that the unit is undam-
aged and complete. Check that the packaging contains the following:
AF-60 LP™ Micro Drive
Quick Guide
2.2 Side-by-Side Installation
The frequency converter can be mounted side-by-side for IP 20 rating units and requires 100 mm or 3.94 inclearance above and below for cooling. Regarding
surroundings in general, please see chapter 7. Specifications.
Illustration 2.2: Side-by-side installation.
AF-60 LP™ Micro Drive Operating Instructions
Illustration 2.1: Content of box.
DET-579A
2
9

Advertisement

Table of Contents
loading

Table of Contents