9.4.
Total charging weight of the refrigerant
(after a leak, etc.)
The total charging amounts relate to the refrigerant piping
length.
Refrigerant piping length (liquid side)
Model
1UH071N1ERG
2.5
1UH090N1ERG
2.5
1UH105N1ERG
1UH125P1ERG
1UH125P1ERK
3.7
1UH140P1ERG
1UH140P1ERK
1UH160P1ERG
1UH200W1ERK
6.35 6.35 6.35 7.15 7.95 8.75 9.55 9.95
1UH250W1ERK
9.5 Add oil instruction
The cumout of oil added can be calculated by the following
formula :Q=(A+(L-30)*B)/4-C
factory refrigerant
mode
charge
1UH071N1ERG
1UH090N1ERG
1UH105N1ERG
1UH125P1ERG
1UH140P1ERG
1UH160P1ERG
1UH125P1ERK
1UH140P1ERK
1UH200W1ERK
1UH250W1ERK
Note:
a.when Q<0,oil added=0;
b.when Q>0,oil added=Q(cc);
c.L is the liquid pipe length ,unit(m)
2.5 2.5 2.95 3.4
2.5 2.5 2.95 3.4 3.85
3.7 3.7 4.15 4.6
5.05 5.5 5.95
recharge
quantity
A(g)
B(g/m)
2500
45
3700
45
6350
80

10. Electrical wiring work

WARNING
All wiring must be performed by an authorized
electrician.
All components procured on the side and all elecrtic
construction shall comply with the applicable
legislation.
DANGER: HIGH VOLTAGE
To avoid electrical shock, make sure to disconnect the
power supply 1 minute or more before servicing the
electrical parts. Even after 1 minute, always measure
the voltage at the terminals of main circuit capacitors
or electrical parts and, before touching , make sure that
those voltages are 50VDC or less.
NOTICE
To persons in charge of electrical wiring work:
Do not oerate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will
break the compressor.)
10.1.
Precautions on electrical wiring work
When servicing the unit requires the refrigerant system
to be opened, treatment and evacuation of refrigerant
must be done in accordance with applicable legislation.
Refrigerant can not be charged until field wiring has been
completed.
Refrigerant may only be charged after performing the
leak test and vacuum drying.
factory oil
charging
C(cc)
DANGER
870
Before obtaining access to terminal devices, all
supply circuits must be interrupted.
Be sure to install an earth leakage circuit breaker
1400
in accordance with aplicable legislation. Failure to
do so may cause electrical shock.
1700