42
U N I S E C I N S TA L L AT I O N M A N U A L
4. Cable connections
Figure 102. RLC transversal part
4) Unscrew, lift and remove the cable
protection sheet of the RLC unit.
Figure 103. RLC internal cover
Connect the MV cables.
1) Cut the cable glands at the bottom of the
RLC unit according to the cable diameter and
fix the cables in the centre of the RLC unit to
the locking part.
Figure 104. RLC unit cable locking parts
Figure 105. Cable glands on the bottom of the RLC unit